User Tools

Site Tools


agile:spike

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
agile:spike [2021/01/07 12:37] peteragile:spike [2023/06/09 16:59] (current) peter
Line 3: Line 3:
 A spike helps clarify a story. A spike helps clarify a story.
  
-It allows a team to figure out what needs to be built and how the team is going to build it — in advance of actually building it. +  * It allows a team to figure out what needs to be built and how the team is going to build it — in advance of actually building it. 
- +  A little bit of the team’s capacity is allocated ahead of when the story needs to be delivered, so that when the story comes into the sprint, the team knows what to do.
-A little bit of the team’s capacity is allocated ahead of when the story needs to be delivered, so that when the story comes into the sprint, the team knows what to do.+
  
 ---- ----
agile/spike.1610023074.txt.gz · Last modified: 2021/01/07 12:37 by peter

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki